A packing change intended to reduce cost

In its July 2025 account, Frad describes wind-turbine equipment shipped in containers with metal frames and tarpaulin covers. Collision and scratch damage increased after the packing change.

Reviewing rigidity and handling clearance

The consultant identified inadequate frame rigidity and limited container clearance as risks, recommending cushioning and structural reinforcement.

The outcome at the advisory stage

The review produced a risk assessment and corrective options. Frad’s account does not confirm that the recommendations were implemented or that damage subsequently declined.

Review freight cost alongside cargo protection

Compare cargo protection and loading access alongside packed volume. Ask the supplier for final dimensions, support points and stacking restrictions, and review changes before approving transport. Send PersiaCargo photos and specifications of the final package for coordination, identifying any need for a specialist engineering assessment separately.

Original sources

The next step for your order

Prepare your goods details, quantities, origin and destination.

Request a quote